Personnel & Communication
Rigging supervisor identified and responsible
Communication method established & confirmed
Equipment Verification
Rigging equipment in acceptable condition
Rigging equipment appropriate for lift
Working load limits clearly marked/visible
All equipment properly inspected & certified
Load Assessment
Load weight confirmed & documented
Center of gravity location identified
Load description accurate & documented
Rigging Geometry
Sling angles determined & appropriate
Side loading minimized
Slings padded at corners, edges & sharp surfaces
Load rigged at center of gravity
Hitch & Configuration
Hitch type appropriate for load
Working load limits adequate for combined tensions
Safety Measures
Taglines assigned if needed
Personnel clear of suspended load path
No fouling hazards identified
Stability
Load will lift level & remain stable
Special Considerations
Unusual concerns or special requirements addressed
Access Control
Lift area cordoned off/secured
Unauthorized personnel excluded
Positioning
All personnel positioned outside load footprint
Landing zone clear and prepared
Communication
Signal person assigned & positioned
Two-way radio or hand signals verified
Rescue
Emergency procedures reviewed
Slings
No cuts, broken strands, or abrasion damage
No chemical corrosion or burn marks
Shackles
Pins secure and functioning properly
No bent, cracked, or deformed pins
Hooks
No twisting, bending, or deformation
Hardware
All fasteners tight and secure
Safety latches operational on all hooks
USE AT YOUR OWN RISK — VERIFY CRITICAL RESULTS
This report is a field calculation aid, not a substitute for qualified rigging knowledge, required engineering, manufacturer data, applicable standards, or site procedures. Independently verify all inputs, calculations, load paths, and equipment capacity before use.